In the First Week
The steel beams are lifted by crane and fitted in loft sitting on steel spreader
plates on the external wall and parity wall just above existing ceiling joists.
The old roof tiles & battons are stripped
The old hip roof rafters are removed
The front roof rafters are extended to the gable end
The front roof is
re-felted, battoned and tiled